Interim Management

Interim plant management for production sites in the ceramics industry

When a leadership position is vacant, a plant misses its targets or a site runs into crisis, I take on operational responsibility at short notice as Plant Manager, Plant Director, Operations Manager or COO.

Not as an outside advisor but in the line: with authority to give instructions, responsibility for results and a clear mandate.

What interim management delivers

Leadership that works from day one, not after a long onboarding

An interim manager takes on operational responsibility at short notice. Instead of months of analysis, the focus is on fast orientation, clear priorities and consistent execution.

What I take on

What it is explicitly not

Typical situations

When an interim manager is the fastest route

The triggers differ, but the pattern is similar: leadership capacity is missing exactly where results are created, in the plant.

Vacant plant management

A site is left without leadership due to resignation, illness or a transition that takes longer than planned.

Production crisis

Scrap, downtime or quality problems put delivery capability and customer relationships at risk.

Pressure on results

Manufacturing costs and energy consumption are getting out of hand and the plant is clearly missing its budget targets.

Turnaround & restructuring

A site needs to be repositioned organizationally, technically and economically, often under time pressure.

Restructuring & plant closure

When a site is no longer economically viable, I provide support from the technical and economic assessment of different scenarios through to operational implementation, including production relocation, personnel measures, dismantling and handover or sale of the site.

Site assessment & strategic decision

When a decision on investment, restructuring, relocation or closure has to be made, I deliver a sound technical and operational assessment as the basis for the decision.

Andreas Girschik, Interim Manager, steht im grauen Sakko lächelnd an einem Geländer in einer Produktionshalle
My role in your company

Versatile and tailored exactly to your situation

Depending on the mandate, I take on different roles. What they have in common is real responsibility.

Plant Director / Plant Manager

Overall responsibility for a production site including production, engineering, quality and maintenance.

Operations Manager

Managing several plants or production areas with a focus on performance, cost and delivery performance.

COO / Technical Managing Director

Overall operational responsibility at management level, including investment and strategy topics.

Turnaround Project Lead

Leading time-limited restructuring, relocation or transformation projects with a clear target picture.

Approach

Four phases from day one to handover

Every mandate follows the same logic: first understand, then stabilize, then improve, and finally hand over so that it keeps running without me.

01
Weeks 1 to 2

On-site analysis

I get an unfiltered picture of equipment, processes, figures and the team.

02
Weeks 2 to 6

Stabilize

First, the critical operational topics are stabilized: delivery capability, quality, cost and leadership are brought back under control.

03
Months 2 to 8

Improve

On a stable basis, the structural topics with a measurable contribution to results follow.

04
End of mandate

Hand over

The plant keeps running, with a trained successor and documented standards.

Selected Executive Results

Measurable results from international plant and operations responsibility

An excerpt from completed assignments. For reasons of confidentiality I do not name clients, but I am happy to do so in a personal conversation where approved.

€1.734m

Operational & Cross-functional Savings

Analysis of the cost structure, introduction of KPI management and optimization of production processes.

MXN 6.481m

Operational Savings

Development of an action program for a lasting reduction of production costs.

OEE 55 → 74%

Performance Improvement

Consistent OEE management, structured analysis of losses and bottlenecks, and targeted improvement measures with the plant team.

85 → 97.3%

Delivery Performance

Stabilization of production processes, introduction of TPM and continuous improvement, and management through operational KPIs.

Selected results from international leadership and interim/operations responsibilities. Details and context in a personal conversation.

Why Andreas Girschik

Industry depth instead of a toolbox of methods

There are many interim managers. What matters is whether someone really knows the processes and pitfalls of ceramic production or first needs them explained.

30+ years of international industry experience

Responsibility as COO, Board Member, Hub Director, Plant Manager and Managing Director, exclusively in manufacturing companies.

Engineering and leadership in one person

Drying, firing, preparation, maintenance: I discuss with engineering on equal terms and still decide on business grounds.

A reliable picture in two weeks

No months of onboarding: after the first analysis phase, a prioritized list of measures is on the table.

Teams that come along

Change succeeds through the people in the plant. I lead directly on the shopfloor instead of from the meeting room.

Internationally deployable

Many years of responsibility for sites in Europe, the USA and Mexico, including intercultural leadership.

Impact beyond the mandate

My goal is achieved when the plant continues the improvements on its own.

Regions

On site, where production happens

Operational responsibility cannot be exercised from a distance. The focus is therefore on the production site: willingness to travel and living on site are a natural part of the mandate for me.

Germany

Short-notice travel to plants throughout Germany, with a focus on the ceramic industry regions.

Bavaria · Baden-Württemberg · Hesse · Rhineland-Palatinate · North Rhine-Westphalia · Thuringia · Saxony

Europe

Mandates in European production networks, including responsibility for several sites at the same time.

Austria · Switzerland · Italy · France · Spain · Poland · Czech Republic · Benelux

USA & Mexico

Many years of experience with North American sites and intercultural leadership of international teams.

USA · Mexico · Project work in English and Spanish speaking environments

Located outside these regions? Please get in touch anyway: with the right assignment, work in other countries is possible too.

Does your plant need leadership at short notice?

Describe the situation to me: in a confidential 30 minute initial call we clarify whether an interim assignment is the right route and how quickly it can start.

You can find detailed information on how we handle user data in our privacy policy.

Ceramic Operation Consulting
Andreas Girschik
Rötherstr. 8
65553 Limburg, Germany

FAQ

Frequently asked questions about interim management

The points clients most often want to clarify before placing a mandate.

In urgent cases, an assignment can start within one to two weeks, depending on current workload. If a plant manager position is acutely vacant, a direct call is worthwhile so we can clarify availability right away.

Most assignments run for three to twelve months. Shorter mandates suit clearly defined tasks such as a plant assessment or a stabilization program, longer ones suit turnaround and transformation projects with a structural impact.

A consultant recommends, an interim manager decides. I carry line responsibility, lead the plant team with disciplinary authority and share responsibility for results, including the uncomfortable decisions.

A daily rate is usual, depending on the role, scope of the assignment and travel. After the initial call you receive a transparent offer with a clearly defined scope and target picture.

The handover is part of the assignment: the successor is trained, standards and key figures are documented and ongoing programs have an internal owner. The aim is a plant that keeps running without me.

Yes. Restructuring is part of my leadership experience, including difficult personnel decisions, production relocations and plant closures. Implementation takes place in close coordination with management, HR and employee representatives.

Multi-Site Operations · Germany

€1.734m

Operational Savings

Situation

A German multi-site production organization was under high cost and performance pressure. At the same time, operational stability, delivery performance and quality of results had to be improved across several sites.

Approach

Introduction of consistent KPI and cost management, clear responsibilities at plant level and cross-site operational excellence and cost reduction measures. Performance, costs and improvement projects were reviewed and followed up regularly.

Result

€1.355m operational savings plus an additional €379,000 cross-functional savings, a total of €1.734m in 2022. Further operational key figures were improved at the same time.

Key Result

€1.734m total savings
Manufacturing Plant · Mexico

MXN 6.481m

Cost Reduction

Situation

A production plant in Mexico needed more consistent cost management as well as improvements in productivity, scrap and operational performance.

Approach

Setting up a structured improvement program focused on cost reduction, scrap & losses, lean/continuous improvement and productivity. Measures and results were tracked systematically.

Result

In 2018, MXN 6.481m in operational savings were realized. The improvement work was continued afterwards.

Key Result

MXN 6.481m operational savings
Manufacturing · Germany

OEE 55 → 74%

Operational Excellence

Situation

A German production site within a multi-site organization showed considerable potential in equipment performance and operational efficiency.

Approach

Consistent management via OEE and operational KPIs, structured analysis of losses and bottlenecks, and implementation and follow-up of targeted improvement measures together with the plant team.

Result

OEE was improved from 55% to 74%. In parallel, cost, quality and delivery performance programs were implemented across the multi-site network.

Key Result

+19 percentage points OEE
Plant Transformation · Mexico

85 → 97.3%

Delivery Performance

Situation

In 2007, on-time delivery at a Mexican production plant stood at 85.0%, well below the 95% target. At the same time, there were challenges in production stability, quality and equipment performance.

Approach

Stabilization of production workflows, introduction of TPM and continuous improvement, and consistent management of production, maintenance, quality and delivery performance through operational KPIs.

Result

On-time delivery rose from 85.0% in 2007 to 97.3% in 2009, exceeding the 95% target. With 96.1% in 2010, the improvement was also sustained in the following year.

Key Result

+12.3 percentage points delivery performance
Logo von Whale Marketing, ein schwarzer Wal

Support anfordern

Einfach Formular unten ausfüllen und die Aufgabe wird mir direkt per E-Mail geschickt und automatisiert nach Dringlichkeit in meine Aufgabenliste eingefügt.

[formidable id=2]