The potential rarely lies in new equipment, but in the processes in between
Scrap, downtime, rising energy costs, delivery performance that only holds thanks to extra shifts: the symptoms are well known, the causes usually lie deeper.
I analyze your value chain along the real bottlenecks and implement improvements together with your team until they are anchored in daily operations.
What changed in projects
Manufacturing costs after analysis of the cost structure and KPI management
Energy consumption through optimized drying processes
OPEX potential identified in an action program
Do you recognize your plant here?
Tick the statements that apply to your production. The result appears automatically, without entering any data and without anything being transmitted.
Six levers: the analysis decides which one works
These fields cover most of the potential in ceramic production. In practice they are never all addressed at once, but two or three with the best ratio of impact and effort.
Key figures that trigger decisions
Many plants have figures in abundance, yet they lead to no action. We reduce them to the measures that really explain the contribution to results and anchor them in the daily management rhythm.
- Condense the KPI system into a few control figures
- Establish daily control loops on the shopfloor
- Assign clear responsibility for each key figure
- Link deviations to a defined response
Typically: 4 to 8 weeks to a working control loop
Making waste visible and eliminating it
Between preparation, forming, drying and firing, inventories, routes and waiting times arise that nobody planned consciously. The value stream reveals them and makes the order of measures clear.
- Value stream analysis across the entire chain
- 5S and standard work in pilot areas
- Changeover time optimization using SMED
- Reduce inventories and lead times
Typically: pilot area first, then rollout
Reducing manufacturing costs structurally
Across-the-board savings programs rarely last. We break the cost structure down to process level and act where effort and impact are in proportion.
- Cost structure per product group and line
- Material, scrap and rework costs
- Maintenance and external service costs
- Business case for each individual measure
Typically: −10 to −16% manufacturing costs over the course of the project
Stable quality across shifts and batches
Fluctuating quality is almost always a process window problem, not a people problem. As soon as the permissible ranges are defined and monitored, scrap usually drops significantly.
- Root cause analysis instead of rework routine
- Define and monitor process windows
- Sharpen inspection and release logic
- Trace complaints systematically
Typically: less variation between shifts
Raising availability and performance systematically
OEE does not rise through more pressure, but through understanding where time is actually lost. The focus is consistently on the bottleneck equipment.
- Downtime analysis with reliable causes
- Set up preventive maintenance anew
- Treat bottleneck equipment with priority
- Make short stoppages visible
Typically: bottleneck first, the rest follows
Addressing the largest cost block
Drying and firing dominate the energy consumption of ceramic plants. Transparency per ton and per unit alone regularly reveals savings that can be realized without investment.
- Make consumption per ton and per unit transparent
- Review drying and firing curves
- Check waste heat use and leaks
- Optimize load peaks and auxiliary units
Typically: −14% energy consumption achieved in one project
What actually changes in everyday plant operations
Improvement is more than a better figure in the report. It shows in how the plant is managed, how decisions are made and how it responds.
| Area | Before | After the project |
|---|---|---|
| Management | Monthly reporting, response weeks later | Daily KPI dialogue on the shopfloor |
| Scrap | Fluctuating, causes unclear | Defined process windows, documented causes |
| Maintenance | Mostly reactive after breakdowns | Planned, prioritized by bottleneck equipment |
| Energy | Total consumption known, but not the drivers | Consumption per ton and per unit transparent |
| Responsibility | Ends at the department boundary | Process-based across departments |
| Improvement | Project by project, fizzles out after months | Standard with an internal owner |
Three formats, depending on the maturity of your situation
Not every plant needs a full program right away. Collaboration often starts small and grows with what the analysis brings to light.
Potential analysis
A reliable picture of the initial situation with a clear assessment of the realistically achievable order of magnitude.
- Shopfloor walk and data collection
- Prioritized list of measures
- Business case for each measure
- Final presentation for management
Implementation program
The measures are implemented together with your managers. I work within the line, not alongside it.
- Steering the action program
- Pilot area, then rollout
- Weekly progress review
- Standardization and training
Sparring & effectiveness review
So that the improvement lasts: regular review of the key figures and backing for your management team.
- KPI review after 3 and 6 months
- Coaching of plant management
- Fine-tuning of ongoing programs
Three situations, three results
An excerpt from completed optimization projects
Refractory Manufacturing
Cost and process potential in two production plants, no consistent KPI management and optimization potential in drying and firing.
KPI system, cost center reviews, standardized drying programs, use of kiln waste heat, capacity and staff planning set up.
Approx. €495,000 annual cost potential identified, plus concrete energy and process improvements.
Site strategy & restructuring
€17.7m investment requirement assessed
An existing production site with an annual volume of around 16 kt faced the strategic question: modernize, restructure or close?
Technical and economic assessment of the site and development of a comprehensive modernization scenario for production, infrastructure, safety and equipment.
Identification of an investment requirement of around €17.7m as the basis for the strategic site decision. After the decision to close, operational implementation including production relocation, personnel measures, dismantling and sale of the site.
Refractory Manufacturing
85.0% → 97.3%
MXN 63.8m cumulatively below budget 2009 to 2011
External cracks −60%
Contamination −63%
Chipping −45%
Where is the potential in your plant?
In a confidential initial call I assess your situation and tell you openly whether an optimization project is worthwhile and what order of magnitude you can expect.
- COO · Board Member · Managing Director · Plant Manager
- International projects in Europe, the USA & Mexico
- Confidential initial consultation
Ceramic Operation Consulting
Andreas Girschik
Rötherstr. 8
65553 Limburg, Germany
Frequently asked questions
The points most often clarified before a project starts. Anything still open we discuss in the initial call.
How long does an optimization project take?
The analysis phase takes two to three weeks. Implementation depends on scope and objectives and typically runs for three to nine months, often with decreasing presence on site once the team carries the programs itself.
Do you work with a fixed set of methods?
Lean, Six Sigma and TPM provide the tools, but they are not the purpose. What matters is which problem actually exists in the plant. Method projects without a concrete link to the bottleneck create effort, but rarely results.
Do I need a particular data basis for this?
No. In many plants the data is incomplete, and that is part of the findings. Where figures are missing, we collect them manually in the analysis phase and at the same time build up the recording needed for management.
How much capacity does my team need to contribute?
No improvement lasts without the involvement of your own team. One to two days per week for the designated owners is realistic, occasionally more during implementation phases.
How does your approach differ from classic management consulting?
I work within the line, not alongside it. Instead of a team of analysts, you get a manager with more than 30 years of international industry experience and many years of leadership and production responsibility in the ceramics industry, who stays until the measures are running.
Can process optimization be combined with an interim mandate?
Yes. With interim plant management, process optimization can be a direct part of the mandate. The advantage: responsibility for decisions, leadership and implementation lies in one hand.