Process Optimization & Operational Excellence

The potential rarely lies in new equipment, but in the processes in between

Scrap, downtime, rising energy costs, delivery performance that only holds thanks to extra shifts: the symptoms are well known, the causes usually lie deeper.

I analyze your value chain along the real bottlenecks and implement improvements together with your team until they are anchored in daily operations.

Typical impact

What changed in projects

−16%

Manufacturing costs after analysis of the cost structure and KPI management

−14%

Energy consumption through optimized drying processes

€400k

OPEX potential identified in an action program

Self-check

Do you recognize your plant here?

Tick the statements that apply to your production. The result appears automatically, without entering any data and without anything being transmitted.

Select the statements that apply to your plant.
Fields of action

Six levers: the analysis decides which one works

These fields cover most of the potential in ceramic production. In practice they are never all addressed at once, but two or three with the best ratio of impact and effort.

Key figures that trigger decisions

Many plants have figures in abundance, yet they lead to no action. We reduce them to the measures that really explain the contribution to results and anchor them in the daily management rhythm.

Measures

Typically: 4 to 8 weeks to a working control loop

Making waste visible and eliminating it

Between preparation, forming, drying and firing, inventories, routes and waiting times arise that nobody planned consciously. The value stream reveals them and makes the order of measures clear.

Measures

Typically: pilot area first, then rollout

Reducing manufacturing costs structurally

Across-the-board savings programs rarely last. We break the cost structure down to process level and act where effort and impact are in proportion.

Measures

Typically: −10 to −16% manufacturing costs over the course of the project

Stable quality across shifts and batches

Fluctuating quality is almost always a process window problem, not a people problem. As soon as the permissible ranges are defined and monitored, scrap usually drops significantly.

Measures

Typically: less variation between shifts

Raising availability and performance systematically

OEE does not rise through more pressure, but through understanding where time is actually lost. The focus is consistently on the bottleneck equipment.

Measures

Typically: bottleneck first, the rest follows

Addressing the largest cost block

Drying and firing dominate the energy consumption of ceramic plants. Transparency per ton and per unit alone regularly reveals savings that can be realized without investment.

Measures

Typically: −14% energy consumption achieved in one project

Impact

What actually changes in everyday plant operations

Improvement is more than a better figure in the report. It shows in how the plant is managed, how decisions are made and how it responds.

Area Before After the project
Management Monthly reporting, response weeks later Daily KPI dialogue on the shopfloor
Scrap Fluctuating, causes unclear Defined process windows, documented causes
Maintenance Mostly reactive after breakdowns Planned, prioritized by bottleneck equipment
Energy Total consumption known, but not the drivers Consumption per ton and per unit transparent
Responsibility Ends at the department boundary Process-based across departments
Improvement Project by project, fizzles out after months Standard with an internal owner
Collaboration

Three formats, depending on the maturity of your situation

Not every plant needs a full program right away. Collaboration often starts small and grows with what the analysis brings to light.

Getting started

Potential analysis

2 to 3 weeks on site

A reliable picture of the initial situation with a clear assessment of the realistically achievable order of magnitude.

Core offer

Implementation program

3 to 9 months

The measures are implemented together with your managers. I work within the line, not alongside it.

Afterwards

Sparring & effectiveness review

Ongoing, a few days per month

So that the improvement lasts: regular review of the key figures and backing for your management team.

Project examples

Three situations, three results

An excerpt from completed optimization projects

Germany

Refractory Manufacturing

Initial situation

Cost and process potential in two production plants, no consistent KPI management and optimization potential in drying and firing.

Measures

KPI system, cost center reviews, standardized drying programs, use of kiln waste heat, capacity and staff planning set up.

Result

Approx. €495,000 annual cost potential identified, plus concrete energy and process improvements.

Germany

Site strategy & restructuring

€17.7m investment requirement assessed

Initial situation

An existing production site with an annual volume of around 16 kt faced the strategic question: modernize, restructure or close?

My contribution

Technical and economic assessment of the site and development of a comprehensive modernization scenario for production, infrastructure, safety and equipment.

Result

Identification of an investment requirement of around €17.7m as the basis for the strategic site decision. After the decision to close, operational implementation including production relocation, personnel measures, dismantling and sale of the site.

Mexico

Refractory Manufacturing

Delivery

85.0% → 97.3%

Plant Costs

MXN 63.8m cumulatively below budget 2009 to 2011

Quality

External cracks −60%
Contamination −63%
Chipping −45%

Where is the potential in your plant?

In a confidential initial call I assess your situation and tell you openly whether an optimization project is worthwhile and what order of magnitude you can expect.

You can find detailed information on how we handle user data in our privacy policy.

Ceramic Operation Consulting
Andreas Girschik
Rötherstr. 8
65553 Limburg, Germany

FAQ

Frequently asked questions

The points most often clarified before a project starts. Anything still open we discuss in the initial call.

The analysis phase takes two to three weeks. Implementation depends on scope and objectives and typically runs for three to nine months, often with decreasing presence on site once the team carries the programs itself.

Lean, Six Sigma and TPM provide the tools, but they are not the purpose. What matters is which problem actually exists in the plant. Method projects without a concrete link to the bottleneck create effort, but rarely results.

No. In many plants the data is incomplete, and that is part of the findings. Where figures are missing, we collect them manually in the analysis phase and at the same time build up the recording needed for management.

No improvement lasts without the involvement of your own team. One to two days per week for the designated owners is realistic, occasionally more during implementation phases.

I work within the line, not alongside it. Instead of a team of analysts, you get a manager with more than 30 years of international industry experience and many years of leadership and production responsibility in the ceramics industry, who stays until the measures are running.

Yes. With interim plant management, process optimization can be a direct part of the mandate. The advantage: responsibility for decisions, leadership and implementation lies in one hand.

Logo von Whale Marketing, ein schwarzer Wal

Support anfordern

Einfach Formular unten ausfüllen und die Aufgabe wird mir direkt per E-Mail geschickt und automatisiert nach Dringlichkeit in meine Aufgabenliste eingefügt.

[formidable id=2]